Power Grid

ZANZIBAR to produce its own power

1 year, 7 months
Irene Jerry

FOR the first time ever, Zanzibar will start generating its own electricity, a move which will reduce dependence on power transported from Tanzania Mainland.

This comes after the Zanzibar government on Monday signed a contract with investors to generate 180MW from solar energy.

The Power Purchase Agreement (PPA) was signed here between Generation Capital Limited (GCL), and the state-owned Zanzibar Electricity Corporation (ZECO).

The investment will be done in partnership between the GCL, a Mauritian-based project development and investment firm and the local company, Taifa Energy which is part of the renowned Taifa Group.

Currently, the Indian Ocean semi-autonomous archipelagos receive about 130MW from the Mainland’s Tanzania Electric Supply Company (TANESCO).

Speaking after the signing of the agreement, Zanzibar Minister for Water, Energy and Minerals, Mr Shaibu Hassan Kaduara said: “Today is part of our huge  happiness…Zanzibar is going to become independent in power production.”

The 180MW Solar PV Project, worth 330bn/-, is expected to revolutionise Zanzibar’s energy landscape and will ensure the reliable supply of clean and renewable power to the citizens of Zanzibar, the tourism and other industries and will pave the way for a sustainable future.

The Revolutionary Government of Zanzibar, through the Zanzibar Investment Promotion Authority (ZIPA), granted GCL strategic investor status following their successful application to invest in Zanzibar, proposing multi-phase 180-megawatt renewable energy facilities in various strategically identified locations in Zanzibar.

The visionary project will be completed on a fast track to ensure the creation of jobs and sustainable development in key sectors depending on reliable and affordable power supply.

The project will be built in phases and will commence with the expedited construction of a 30 MW Solar PV power plant at Bambi, Central District in South Unguja Region that will be completed in 2024.

The GCL and their local partner Taifa Group plan to implement the subsequent phases quickly: the current lack of reliable power creates suppressed demand and limits economic growth in Zanzibar.

This project will provide an immediate boost to Zanzibar’s renewable energy capacity, contributing significantly to the reduction of greenhouse gas emissions and the overall development of Zanzibar.

Generation Capital Limited and Taifa Group will also incorporate advanced Battery Energy Storage Systems into later phases of the project, ensuring reliable and efficient energy supply during evening peak demand.

“We are thrilled to announce this landmark partnership with the ZECO for the first-ever utility-scale solar PV project in Zanzibar,” said Mr Rostam Aziz, Chairman of Taifa Group.

He added: “This project represents a significant milestone in our commitment to renewable energy development in Zanzibar and the continent as a whole.”

Through the partnership, Zanzibar will have access to inexpensive, clean, and reliable power infrastructure that, in turn, will quickly foster economic growth and the betterment of the quality of life for all citizens.”

Generation Capital Limited and Taifa Group’s investment in Zanzibar’s solar PV infrastructure aligns with the country’s vision.

The integration of solar PV into Zanzibar’s energy mix supports the Blue Economy agenda enhancing energy security, diversifying the energy mix, and promoting sustainable development.

The signing of the PPA signifies the collective dedication and determination of all parties involved to accelerate the energy transition in Zanzibar.


Comments

Add comment

Related Post

Power Grid

ETHIOPIA SET TO BEGIN ELECTRICITY EXPORTS TO TANZANIA VIA KENYA.

Ethiopia is preparing to export 100 megawatts of electricity to Tanzania via Kenya, marking a major step in regional energy trade. The deal, once finalized, aims to strengthen East African energy cooperation and enhance power access across the region.

3 weeks, 1 day

Power Grid

TANZANIA INSTALLS 340 MVA TRANSFORMERS TO ENHANCE POWER SUPPLY.

Tanzania is upgrading the Kinyerezi One power station with new transformers to meet rising electricity demand. This is part of a broader effort to improve the national power infrastructure and support economic growth.

3 weeks, 3 days

Power Grid

DR. BITEKO ENGAGES WITH EGYPTIAN MINISTER OF HOUSING TO OVERSEE COMPLETION OF JNHPP PROJECT.

On October 17, 2024, in Dar es Salaam, Deputy Prime Minister and Minister of Energy, Dr. Doto Biteko, held a meeting with the Egyptian Minister of Housing, Services, and Urban Communities, Mr. Sherif El Sherbiny.

1 month, 3 weeks

Power Grid

TANZANIA: MRAMBA WELCOMES BRITISH COMPANIES TO INVEST IN RENEWABLE ENERGY.

The Permanent Secretary of the Ministry of Energy, Engineer Felchesmi Mramba, has invited companies from the United Kingdom to invest in the energy sector.

2 months, 2 weeks

Power Grid

TANZANIA SETS PLANS TO UTILIZE NUCLEAR ENERGY FOR ELECTRICITY PRODUCTION.

Tanzania has revealed its strategic intentions and readiness to develop nuclear energy as part of its efforts to establish alternative sources of clean electricity, supporting both economic development and societal progress.

3 months, 2 weeks

Power Grid

TANZANIA: GGM MINE SWITCHES TO GRID ELECTRICITY INSTEAD OF FUEL.

Deputy Prime Minister and Minister of Energy, Hon. Dr. Doto Biteko, has inaugurated a 34 MW power reception and substation at the Geita Gold Mine (GGM).

3 months, 4 weeks

Power Grid

TANZANIA IS READY TO UTILIZE THE OPPORTUNITY OF THE JOINT ELECTRICITY MARKET - DR. BITEKO.

Tanzania is well-prepared to take advantage of the joint electricity market available to member countries of the East African Power Pool (EAPP) by ensuring the integration of its electricity transmission infrastructure with that of other EAPP member countries.

3 months, 4 weeks

Power Grid

TANZANIA: TAZA PROJECT TO CONNECT ELECTRICITY IN AFRICA.

The government has said that the major TAZA electricity transport project involving the construction of a 400 kilograms of voltage electricity.

4 months, 1 week

Power Grid

TANZANIA: PRESIDENT SAMIA INSTRUCTS MINISTRY OF ENERGY TO PROVIDE KATAVI WITH GRID ELECTRICITY BY SEPTEMBER.

The President of the Republic of the Union of Tanzania, H.E. Dr. Samia Suluhu Hassan has called on the Ministry of Energy and Tanzania Electricity Corporation (TANESCO) to ensure that the project of the highway transporting electricity from Tabora to Katavi (132kV) and the construction of a station for receiving, cooling and distribution of electricity are completed on time so that Katavi province to be included in the national grid by September this year.

5 months

Power Grid

TANZANIA: DR. BITEKO MEETS WITH INVESTORS OF MODERN INDUSTRIAL PARK.

He insists that the government will continue to cooperate with investors.

5 months, 2 weeks

Power Grid

UGANDA: EACOP PARTICIPATES AT THE 2ND ANNUAL JOINT CSO CONFERENCE IN KAMPALA.

EACOP actively participated in the 2nd Annual Joint Civil Society Organization (CSO) Conference, with the topic "Building Consensus on Uganda's Energy Transition Plan."

5 months, 3 weeks

Power Grid

KENYA: PRESIDENT RUTO LAUNCHES LAST MILE CONNECTIVITY PROJECT TO LIGHT UP 280,000 HOUSEHOLDS.

President William Ruto launched a crucial phase of the Last Mile Connectivity Project, aimed at connecting 280,000 households in 32 counties.

5 months, 4 weeks

Power Grid

TANZANIA: JULIUS NYERERE ELECTRICITY PROJECT (JNHPP) REACHES 97.43 PERCENT.

While reading the speech of the General Budget of the Government for the financial year 2024/2025, Parliament-Dodoma, Minister of Finance, Dr. Mwigulu Nchemba has said the President, Hon. Dr. Samia Suluhu Hassan received the Julius Nyerere Water Project (JNHPP) that will generate a total of 2,115 MW with about 37 percent where up to In April 2024 the implementation had reached 97.43 percent.

6 months

Power Grid

TANZANIA TO CONTINUE TO PRIORITIZE ALTERNATIVE SOURCES OF ELECTRICITY.

Deputy Prime Minister and Minister of Energy Hon. Dr. Doto Biteko, has told the German business community and energy stakeholders that Tanzania will continue to give priority to alternative sources of energy including gas, wind, solar and other alternate sources of electricity, to be sure of adequate electricity availability. to the citizens.

6 months

Power Grid

TANZANIA: MINISTRY OF ENERGY PARTICIPATES IN THE NATIONAL RENEWABLE ENERGY CONFERENCE.

📌 Explains the efforts of the Government in developing renewable energy in the country. 📌 National Renewable Energy Strategy and Work Plan to be launched.

6 months

Power Grid

TANZANIA: MORE THAN A TSH. 80 BILLION DISTRIBUTES ELECTRICITY TO VILLAGES IN SINGIDA PROVINCE.

Kapinga takes electric celebrations to Maswauya and Mdilu Singida North.

6 months, 1 week

Power Grid

TANZANIA: THE LEADER IN AFRICA FOR ELECTRICITY DISTRIBUTION TO CITIZENS.

Tanzania has been congratulated by the World Bank for being among the leading countries in supplying electricity to its citizens.

6 months, 1 week

Power Grid

KENYA: "UNIVERSAL ELECTRICITY CONNECTIVITY PLAN IS ON COURSE", SAID PRESIDENT RUTO

The government has secured KSh27 billion to connect 280,000 households to electricity under the Last Mile Connectivity Project.

6 months, 2 weeks

Power Grid

TANZANIA: DR. BITEKO LAUNCHES ELECTRICITY COOLING STATION IN IFAKARA.

Deputy Prime Minister and Minister of Energy, Hon. Dr. Doto Biteko has launched a station to receive and cool electricity for Ifakara (20MVA) whose completion has led to Kilombero, Ulanga and Malinyi districts in Morogoro province to get enough and reliable electricity.

6 months, 2 weeks

Power Grid

KENYA'S AMBITIOUS PLAN TO BECOME A CLEAN TECH HUB.

Kenya stands out as a leader in Africa with nearly 90% of its power mix coming from renewable energy sources. The country seeks to leverage this expertise to become a green technology supplier through partnerships with major economies.

6 months, 2 weeks

Power Grid

TANZANIA: DKT. BITEKO HAD CONVERSATION WITH THE AMERICAN AMBASSADOR IN THE COUNTRY.

Deputy Prime Minister and Minister of Energy, Hon. Dr. Doto Biteko has met for talks with the American Ambassador here in the country Dr. Michael Battle Sr. concerning various development issues including the use of various sources of electricity.

7 months

Power Grid

TANZANIA: REA PLANS TO SPREAD ELECTRICITY IN 31,532 NEIGHBORHOODS THAT WERE REMAIN.

Rural Energy Agency (REA); expects to distribute electricity services to the remaining 31,532 suburbs in the country to accelerate access to energy services aimed at improving the living conditions of rural citizens.

7 months, 2 weeks

Power Grid

TANZANIA: WORKS TO BE IMPLEMENTED BY THE MINISTRY OF ENERGY FOR THE FINANCIAL YEAR 2024/25

In 2024/25, the Government through the Rural Energy Agency (REA) will continue to take steps to deliver energy to rural areas to accelerate economic growth and social development in the regions.

7 months, 3 weeks

Power Grid

TANZANIA: DKT. BITEKO OFFICIALLY OPENS ENERGY WEEK EXHIBITION 2024.

Deputy Prime Minister and Minister of Energy, Hon. Dkt. Doto Biteko, on 16th April 2024 has officially opened the Energy Week exhibition at the Parliament grounds, Dodoma City, where he has thanked the President, Dr. Samia Suluhu Hassan for strengthening the Energy Sector based on the materials and instructions he gives that have distinguished him as a leader.

8 months

Power Grid

TANZANIA: ENGINEER SAIDY "TENDERS ON REA PROJECTS TO BE AWARDED TO CONTRACTORS WITH HISTORY OF GOOD PERFORMANCE".

Engineer Hassan Saidy has said that REA decided to award contractors with certificates that perform well in electricity supply in rural areas.

8 months

Power Grid

TANZANIA: DKT. BITEKO NEEDS TARURA, TANESCO TO DELIVER ITS SERVICES TO NGORONGORO.

Deputy Prime Minister and Minister of Energy, Hon. Dkt. Doto Biteko has instructed the Electricity Corporation in the country (TANESCO) to ensure that it takes electricity services to areas of development projects to facilitate services to citizens.

8 months

Power Grid

TANZANIA: RURAL ENERGY AGENCY (REA) DISTRIBUTES 200 EFFICIENT STOVES IN TANGA REGION.

Chairman of the Rural Energy Board (REB), Ambassador and Retired Major General Jacob Kingu, accompanied by the Director General of the Rural Energy Agency (REA), Engineer Hassan Saidy, and the REA management, together with development partners, distributed 205 efficient stoves using less firewood and charcoal to students and villagers of Madumu village in Korogwe district, Tanga region.

8 months, 1 week

Power Grid

TANZANIA: BIG THINGS TO BE PROMISED ON THE VISIT OF RURAL ENERGY BOARD, MSOMERA.

The Rural Energy Board (REB) conducted a visit to Msomera in Handeni district, where new settlements are being established by people voluntarily moving from the Ngorongoro National Park. Various commitments have been made to ensure the success of this relocation.

8 months, 3 weeks

Power Grid

TANZANIA: REA AND TANESCO INVEST 48 BILLION TO ELECTRIFY 5,000 HOMES IN TANGA VILLAGES.

The Rural Energy Agency (REA), in collaboration with the Tanzania Electric Supply Company (TANESCO), on March 21, 2024, entered into a partnership to start implementing Phase Two of the project to distribute electricity to 5,000 houses in the villages of Msomera, Saunyi, and Kitwai B in Handeni district, Tanga region, with the project costing 48 billion shillings.

8 months, 3 weeks

Power Grid

TANZANIA: REA INVESTS 44 BILLION IN RURAL ELECTRICITY PROJECTS IN PWANI REGION.

REA (Rural Energy Agency) spends 44 billion to build electricity distribution projects in rural areas in the Pwani Region. Engineer Saidy said the project aims to bring electricity to 30 small mines in the districts of Bagamoyo, Chalinze, and Kisarawe, as well as to agricultural areas not yet served by electricity in the Pwani Region, costing more than 2.456 billion shillings.

8 months, 4 weeks

Power Grid

TANZANIA: DR. DOTO BITEKO LAUNCHES IMPLEMENTATION OF THE LARGE-SCALE KISHAPU SOLAR POWER PROJECT (150MW).

Deputy Prime Minister and Minister of Energy, Dr. Doto Biteko, today launched a large-scale solar power project that will generate 150 megawatts in Ngunga Village, Kishapu District, Shinyanga Region.

9 months

Power Grid

TANZANIA: PIC COMMENDS REA PROJECTS IN MANYARA AND ARUSHA FOR RURAL ELECTRIFICATION EFFICIENCY.

Members of the Permanent Parliamentary Committee on Public Investment Corporations (PIC), led by the Chairperson of the Committee, Hon. Deus Sangu, today, March 12, 2024, visited the Rural Electrification Project REA III (Phase II) in Masware village, Babati District, Manyara Region, and later Miswakini Juu village in Monduli District to commend the Rural Electrification Agency (REA) for its efficiency in coordinating and managing the electrification of rural areas.

9 months

Power Grid

TANZANIA: VICE PRESIDENT TURNS ON REA ELECTRICITY PROJECT AT KETUMBEINE HEALTH CENTER.

The Vice President of the United Republic of Tanzania, Hon. Dr. Philip Isdor Mpango, has inaugurated electricity at Ketumbeine Health Center, located in the village of Armanie in Longido District, Arusha Region, and commended the Rural Energy Agency (REA) for efficiently distributing this energy.

9 months, 1 week

Power Grid

TANZANIA: MOROGORO, REA IGNITES A 25 BILLION PROJECT TO COOL AND DISTRIBUTE ELECTRICITY (IFAKARA SUB STATION).

The government of the Union Republic of Tanzania through the Rural Energy Agency (REA) in collaboration with the European Union (EU) has lit up the Ifakara cooling and distribution station that has costed 25 billion shillings.

9 months, 2 weeks

Power Grid

KENYA TO COLLABORATE WITH TANZANIA ON GEOTHERMAL ENERGY DEVELOPMENT

Deputy Prime Minister and Minister of Energy, Hon. Dkt. Doto Biteko has said that the work of drilling thermal wells in Tanzania will start in April this year so that we can verify the existing thermal resources before starting the activities of generating electricity from that energy.

9 months, 2 weeks

Power Grid

KENYA: COUNTRIES WITH EAPP AGREED TO PUSH ELECTRICITY PROJECTS.

The Council of Ministers involved in the Joint Electricity System for East African Countries (EAPP Council of Ministers-COM) has jointly agreed to have the proper management of various electricity projects in member countries, so that they can be completed on time and provide the citizens with sufficient energy.

9 months, 2 weeks

Power Grid

DR. BITEKO ARRIVES IN KENYA TO ATTEND EAPP MEETING.

Deputy Prime Minister and Minister of Energy, Hon. Dr. Doto Biteko has arrived in Kenya to attend the 18th Meeting of the Council of Ministers responsible for the Eastern Africa Power Pool (EAPP Council of Ministers) scheduled to take place on February 27 and 28, 2024 in Nairobi.

9 months, 3 weeks

Power Grid

PWANI REGION- RUFIJI DISTRICT: HISTORY IS BEING WRITTEN- JNHPP INJECTS 235 MEGAWATTS INTO THE NATIONAL GRID.

The Deputy Prime Minister and Minister of Energy, Hon. Dr. Doto Biteko, has stated that the Julius Nyerere Hydropower Project (JNHPP), with a capacity of 2,115 megawatts, has commenced operations and injected 235 megawatts into the national grid through Unit 9.

9 months, 3 weeks

Power Grid

IRINGA: ALL 360 VILLAGES IN IRINGA ARE NOW CONNECTED TO ELECTRICITY.

. More than 64% of all suburbs have electricity. . Dr. Biteko wants the distribution pace to match the demand.

9 months, 3 weeks

Power Grid

TANZANIA: “LEADERS OF VILLAGES, DISTRICTS AND NEIGHBORHOODS SHOULD ENCOURAGE CITIZENS TO JOIN THE ELECTRICITY SERVICE IN THEIR HOMES” SAID BY DEPUTY MINISTER JUDITH KAPINGA.

“The Government's aim is to bring electricity to every citizen” said Deputy Minister of Energy Hon. Judith Kapinga has urged the leaders of villages, wards and townships to encourage citizens to connect electricity service to their homes in order to implement the Government's ambition to ensure that it delivers electricity to all citizens.

9 months, 3 weeks

Power Grid

Unveiling Tanzania's Ambitious Sh3 Trillion Energy Development Plan

The budget for the energy ministry in the fiscal year 2023/2024, amounting to TSh 3.049 trillion, aligns with President Samia Suluhu Hassan's objective of expanding electricity provision, preserving the environment through the utilization of sustainable energy sources, safeguarding Tanzanians against fluctuating global oil prices, and ensuring that Tanzanians reap the benefits of the country's substantial natural gas reserves.

1 year, 6 months

Power Grid

GEITA : VIJIJI 353 VIMEUNGWANISHIWA UMEME

Makamba alisema kuwa jumla ya Vijiji 486 vilivyopo katika Mkoa wa Geita ni vijiji 353 vilivyopata umeme

2 years, 1 month

Power Grid

KASULU YAUNGWANISHWA NA UMEME WA GRIDI YA TAIFA

RAIS SAMIA SULUHU HASSAN AWASHA UMEME WA GRIDI KASULU, KIGOMA

2 years, 1 month

Power Grid

BAJETI YA MATENGENEZO YA MIUNDOMBINU YA UMEME YAONGEZWA

BAJETI YA MATENGENEZO YA MIUNDOMBINU YA UMEME YAONGEZWA KUIMARISHA UPATIKANAJI UMEME

2 years, 3 months

Power Grid

REA YATUMIA TAKRIBANI TRILIONI 3 KUFIKISHA UMEME VIJIJINI

REA YATUMIA TAKRIBANI TRILIONI 3 KUFIKISHA UMEME VIJIJINI

2 years, 3 months

Power Grid

UJENZI WA BWAWA LA NYERERE WAFIKIA 67%

Tarehe 10 mwezi wa nane,Waziri wa nishati ,January Makamba anasema ujenzi wa Bwawa la kuzalisha umeme la Julius Nyerere (JNHPP) utakaozalisha megawati 2,115 umefika asilimia 67.

2 years, 3 months

Power Grid

MAKAMBA MWENYEKITI MPYA MRADI WA UMEME WA RUSUMO

WAZIRI MAKAMBA MWENYEKITI MPYA MRADI WA UMEME WA RUSUMO

2 years, 3 months

Power Grid

Serikali Kutekeleza Mradi Mkubwa Wa Umeme wa Rumakali

Tumeamua kutekeleza mradi mkubwa wa umeme wa Rumakali - MAKAMBA

2 years, 4 months

Power Grid

GRIDI YA TAIFA KUFIKA MPIMBWE Wizara ya Nishati imeahidi kuendelea na

Wizara ya Nishati imeahidi kuendelea na usimamizi wa miradi ya kuzalisha na kusafirisha umeme nchini ikiwa ni pamoja na kuunganisha Mkoa wa Katavi kwenye Gridi ya Taifa,

2 years, 4 months

Power Grid

Mradi wa Rusumo kuongeza Uhakika wa Umeme Kanda ya Ziwa

Mradi wa Rusumo kuongeza uhakika wa umeme Kanda ya Ziwa

2 years, 5 months

Power Grid

TANESCO - Mwezi Agosti 2022 Tunawasha Umeme wa Gridi Kigoma

Mwezi Agosti 2022 tunawasha umeme wa Gridi Kigoma- Katibu Mkuu Nishati

2 years, 5 months

Power Grid

Mradi wa RUSUMO kukamilika Novemba 2022, Ujenzi wafikia 95%

Mradi wa RUSUMO kukamilika Novemba 2022, Ujenzi wafikia 95%

2 years, 5 months

Power Grid

BARAZA LA USHAURI LA EWURA LATEMBELEA MRADI WA JNHPP

BARAZA LA USHAURI LA SERIKALI LA EWURA LATEMBELEA MRADI WA JNHPP

2 years, 5 months

Power Grid

EWURA WATEMBELEA MTAMBO WA KUZALISHA UMEME MTERA

WAFANYAKAZI WA EWURA WAFANYA ZIARA KATIKA MTAMBO WA KUZALISHA UMEME MTERA

2 years, 6 months

Power Grid

Megawati 200 za Jotoardhi Kuzalishwa Kabla ya Mwaka 2025

Megawati 200 za Jotoardhi kuzalishwa kabla ya mwaka 2025

2 years, 8 months

Power Grid

EWURA Yakusanya Maoni Bei Mpya Ya Umeme Kigoma

EWURA YAKUSANYA MAONI YA WANANCHI JUU YA BEI MPYA ZA UMEME ZINAZOPENDEKEZWA KIJIJI CHA KAGERANKANDA, KASULU KIGOMA

2 years, 8 months

Power Grid

Mradi Wa JNHPP Wafikia Asilimia 56

Utekelezaji wa Mradi wa umeme wa Julius Nyerere (JNHPP) kwa sasa umefikia asilimia 56 na kwamba Serikali inaendelea kuhakikisha kuwa mradi huo unatekelezwa kwa kasi, uadilifu, ubora na viwango vinavyotakiwa ili kuweza kufikia malengo yaliyokusudiwa

2 years, 8 months

Power Grid

Naibu Waziri wa Nishati afanya ziara ya ukaguzi

Naibu Waziri wa Nishati afanya ziara ya ukaguzi wa vituo vya kuzalishia Umeme- Ukerewe

2 years, 9 months

Power Grid

SERIKALI KUENDELEA KUPELEKA UMEME SEHEMU MBALIMBALI NCHINI

Naibu Waziri wa Nishati, Stephen Byabato amefanya ziara ya kukagua miradi ya umeme ya gridi ndogo

2 years, 9 months

Power Grid

Naibu waziri akerwa na kasi ndogo ujenzi wa kituo cha umeme

Naibu waziri akerwa na kasi ndogo ujenzi wa kituo cha umeme.

2 years, 10 months

Power Grid

​AfDB yatembelea Mradi wa Umeme wa Zuzu.

Mkurugenzi wa Maendeleo ya Benki ya Afrika nchini Tanzania, Amos Cheptoo ameipongeza Serikali ya Tanzania

2 years, 10 months

Power Grid

GGML Kuanza Kutumia Umeme wa TANESCO

Mpango wa kuunganisha umeme wa gridi ya taifa kuelekea katika mgodi wa Geita Gold Mine Limited (GGML) unaendelea

2 years, 11 months